006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Purple
006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Purple
006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Purple
006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Purple
006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Purple
006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Purple
006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Purple006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Purple006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Purple006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Purple006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Purple006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Purple

Descrições do Produto

Especificações

Avaliações

Descrições do Produto

006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Purple
  • Made of durable nylon material with a 360° rotating black heavy-duty clip and soft padding
  • Very suitable for large, medium and small dogs
  • This dog training leash and collar set is made of strong climbing rope and a durable 360-degree non-tangled rust-proof rotating hook, which is stronger than other standard dog leashes and collars
  • With heavy metal buckles, when your dog suddenly tries to run, it can firmly grasp the collar or seat belt
  • Reflective stripes with highly reflective light can help you and your dog stay safe at night
  • Size: 120cm

Especificações

Geral

Peso do pacote

Avaliações

006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Purple

Número do Item: 642200027A

Desculpe, este item está esgotado.

Temos o mesmo produto em diferentes cores, clique aqui para verificar os detalhes do produto.

Total:
Custo de Envio Estimado: --Mais Opções de Envio
Envio Para -- via --
30 Dias DOA
Garantia de um ano
Pagamento Seguro